getting min value based on inputs
Author: Greg Morphis
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326633
They use it for 100+ line accounts. Umm yeah, not going to happen.
Thank for your time though Brad, good solution for learning purposes.
----- Excess quoted text cut - see Original Post for more -----
Author: Greg Morphis
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326090
Thanks brad! We use Oracle but I should be able to adapt your solution to it.
I'd like to see a CF solution mainly to see the speed difference. The
database solution should blow away the CF solution but I'm curious
none-the-less.
Maybe using your solution I can manage something like that too
----- Excess quoted text cut - see Original Post for more -----
Author: brad
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326070
Ok Greg, I went ahead and just stuck the code and explanation into a
blog post since it was kind of long.
http://www.codersrevolution.com/index.cfm/2009/9/7/Phone-Plan-Matchup-SQL-Brute-Force-Method
Keep in mind this really just one way to do it, and it might not be the
best. I also considered using some recursion to generate the possible
combinations in CF, but this method was a little easier. Use it as a
starting point or don't use it at all. :)
Thanks.
~Brad
The idea is that all lines add up to the total minutes entered in any
possible way because in the end they'll share the minutes.
1 line at 10,000 minutes would fail because there are no plans of that
size.
Priority is on cost, not so much on minutes.
For example if you entered 9100 minutes and 10 lines the solution
would return 9200 minutes.
I'll have to get the exact plans/minutes on Tuesday to provide the
solution.
And if multiple options add up to the same cost then yeah, one at
random would work because it meets the requirements.
Thanks!
Author: Tom Chiverton
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326065
On Saturday 05 Sep 2009, brad@bradwood.com wrote:
> I believe it would take #plans x #lines tries to complete, but the good
> news multiplication and addition are very fast operations even when done
> millions of times. :)
Yup, I do a brute force search, store the results, and then reporting to the
user is just a lookup. Should be nice and fast.
--
Helping to simultaneously establish essential designs as part of the IT team
of the year, '09 and '08
****************************************************
This email is sent for and on behalf of Halliwells LLP.
Halliwells LLP is a limited liability partnership registered in England and Wales
under registered number OC307980 whose registered office address is at Halliwells
LLP, 3 Hardman Square, Spinningfields, Manchester, M3 3EB. A list of members is
available for inspection at the registered office together with a list of those
non members who are referred to as partners. We use the word “partner” to refer
to a member of the LLP, or an employee or consultant with equivalent standing and
qualifications. Regulated by the Solicitors Regulation Authority.
CONFIDENTIALITY
This email is intended only for the use of the addressee named above and may be
confidential or legally privileged. If you are not the addressee you must not
read it and must not use any information contained in nor copy it nor inform any
person other than Halliwells LLP or the addressee of its existence or contents.
If you have received this email in error please delete it and notify Halliwells
LLP IT Department on 0870 365 2500.
For more information about Halliwells LLP visit
www.halliwells.co
Author: Greg Morphis
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326052
The idea is that all lines add up to the total minutes entered in any
possible way because in the end they'll share the minutes.
1 line at 10,000 minutes would fail because there are no plans of that size.
Priority is on cost, not so much on minutes.
For example if you entered 9100 minutes and 10 lines the solution
would return 9200 minutes.
I'll have to get the exact plans/minutes on Tuesday to provide the solution.
And if multiple options add up to the same cost then yeah, one at
random would work because it meets the requirements.
Thanks!
----- Excess quoted text cut - see Original Post for more -----
Author: brad
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326051
I couldn't stop thinking about this last night so I wrote a SQL solution
that appears work based off some assumptions I made about the questions
I posed.
SQL can be handy for brute forcing since Cartesian products represent
all possible combination of 2 or more vectors. That, and SQL Server
handles lots of rows easily.
It actually performs decent considering the millions of possible
combination you can quickly rack up. Let me know how you handle the
scenarios I asked about and I'll show you the code for a starting point.
Actually, I might just paste it in a blog entry since it's kind of
messy to paste all that SQL here.
~Brad
We can help you come up with an algorithm, but first some questions.
Author: brad
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326047
We can help you come up with an algorithm, but first some questions.
In your example you have a setup that proportioned an very large amount
of minutes to one line and 0 minutes to 2 lines. Is it acceptable to
assign a disproportionate amount of minutes to the lines as long as they
all reach the total and have the cheapest possible price?
Also, what do you do if there is no combination of plans to match the
exact number of minutes desired? Do you go with the smallest amount of
overage that is still the cheapest? What if there is a deal that goes
10 minutes over the requested amount for $100, but another configuration
goes 15 minutes over the requested amount for $95? Would you give
priority to the combination that matches the minutes most closely or
costs less?
Also, what if there aren't any plans big enough to satisfy the number of
minutes with the given number of lines. For instance, 1 line, 10,000
minutes. With the current plans available that is impossible. The best
you can do is one PLANI, but that still leaves you 4,000 minutes short.
What would you do?
What do you do if multiple plans add up to the same amount of minutes at
the same price. Which option do you pick? Just random?
Thanks.
~Brad
I'd be willing to try brute force.. but how would I come up with the
code to try different options?
Author: Greg Morphis
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326045
I'd be willing to try brute force.. but how would I come up with the
code to try different options?
----- Excess quoted text cut - see Original Post for more -----
Author: brad
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326030
Well, there's always the brute force method.
I believe it would take #plans x #lines tries to complete, but the good
news multiplication and addition are very fast operations even when done
millions of times. :)
I don't think there is any algorithm or equation you can use since there
is no real pattern or method to the different plans.
~Brad
I was wondering if this is even possible.
given a list of plans...
Author: Dave Watts
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326012
----- Excess quoted text cut - see Original Post for more -----
This sounds like a variation of the traveling salesman problem:
http://en.wikipedia.org/wiki/Travelling_salesman_problem
My comp sci knowledge and math skills aren't really good enough to
help you come up with the best solution to your problem, but you might
take a look at the various approximation algorithms out there to find
a solution.
Dave Watts, CTO, Fig Leaf Software
http://www.figleaf.com/
Fig Leaf Software provides the highest caliber vendor-authorized
instruction at our training centers in Washington DC, Atlanta,
Chicago, Baltimore, Northern Virginia, or on-site at your location.
Visit http://training.figleaf.com/ for more
information!
Author: Greg Morphis
Short Link: http://www.houseoffusion.com/groups/cf-talk/thread.cfm/threadid:60039#326009
I was wondering if this is even possible.
given a list of plans...
Code Price Minutes
PLANA $25.00 0
PLANB $32.00 200
PLANC $42.00 500
PLAND $52.00 750
PLANE $63.00 900
PLANF $84.00 1,400
PLANG $105.00 2,100
PLANH $155.00 4,000
PLANI $210.00 6,000
And given the user's input of say 10 lines and 9500 minutes. Is it
possible to come up with the least costly set up that meets the
requirements? For example. 10 lines 9,500 minutes would be
1 @ PLANI = 210.00 (6000 minutes)
7 @ PLANC = 294.00 (3500 minutes)
2 @ PLANA = 50.00 (0 minutes)
total = 554.00
You'd think it'd be
1 @ PLANI = 210.00 (6000 minutes)
1 @ PLANG = 105.00 (2100 minutes)
1 @ PLANF = 84.00 (1400 minutes)
so that satisfies the 9500 minute requirement
so the other lines would have to go to PLANA
7 @ PLANA = 175.00 (0 minutes)
total = 574.00
Any ideas would be most helpful!
|